Southern Power Generation Intake Cleaning for Main Cooling Water Pump

Client: SOUTHERN POWER GENERATION PASIR GUDANG

Duration: 2 MONTH

SCOPE OF WORKS


  1. Install stop log

  2. Pump water from the water pit

  3. Clean the water pit

  4. Cleaning bend screen

  5. Cleaning bar screen

  6. Cleaning water pit

  7. Remove stop log

VALVE AND TURBINE MAJOR OVERHAUL (Oct'21 - Feb'22)

Client: TUANKU JAAFAR POWER STATION

Duration: 4 MONTH

SCOPE OF WORKS

  1. To prepare special tools and replacement spare parts

  2. To disassembly gas turbine and rotor removal

  3. To inspect and replace blades and other turbines

  4. Gas turbine disassembly and rotor removal

  5. Initial position and clearance measurements

  6. Accessory, coupling, and inner turbine parts inspection and cleaning

  7. Blade inspection and replacement

  8. Mark VI Distribution Control System inspection

  9. Alignment, Testing, and Commissioning

  10. Remove insulation cladding and material to make a hole for the inspection window.

  11. To install temporary and permanent inspection windows.

  12. Housekeeping.

FABRICATE AND INSTALL INSULATION FOR INSPECTION WINDOW DURING U21 & U11 WARRANTY INSPECTION FOR SOUTHERN POWER GENERATION (Aug'21 - Sept'21)

Client: SOUTHERN POWER GENERATION

Duration: 1 MONTH

SCOPE OF WORKS

  1. To fabricate temporary and permanent inspection windows.

  2. Remove insulation cladding and material to make a hole for the inspection window.

  3. To install temporary and permanent inspection windows.

  4. Housekeeping.

INSULATION WORK FOR GT 5TH AT CONNAUGHT BRIDGE POWER STATION (Jan'21)

Client: CBPS GF3

Duration: 10 DAYS

SCOPE OF WORKS

  1. To remove, repair, and install new insulation material.

  2. To fabricate and install new insulation cladding.

  3. To standby during outage periods for emergencies & additional work.

  4. To do the final inspection

  5. Housekeeping



INSULATION WORK AT CONNAUGHT BRIDGE POWER STATION (Oct'20 - Nov'20)

Client: CBPS GF3

Duration: 1 MONTH


SCOPE OF WORKS

  1. To remove, repair, and install new insulation material.

  2. To fabricate and install new insulation cladding.

  3. To do the final inspection

  4. Housekeeping