Southern Power Generation Intake Cleaning for Main Cooling Water Pump
Client: SOUTHERN POWER GENERATION PASIR GUDANG
Duration: 2 MONTH
SCOPE OF WORKS
Install stop log
Pump water from the water pit
Clean the water pit
Cleaning bend screen
Cleaning bar screen
Cleaning water pit
Remove stop log
VALVE AND TURBINE MAJOR OVERHAUL (Oct'21 - Feb'22)
Client: TUANKU JAAFAR POWER STATION
Duration: 4 MONTH
SCOPE OF WORKS
To prepare special tools and replacement spare parts
To disassembly gas turbine and rotor removal
To inspect and replace blades and other turbines
Gas turbine disassembly and rotor removal
Initial position and clearance measurements
Accessory, coupling, and inner turbine parts inspection and cleaning
Blade inspection and replacement
Mark VI Distribution Control System inspection
Alignment, Testing, and Commissioning
Remove insulation cladding and material to make a hole for the inspection window.
To install temporary and permanent inspection windows.
Housekeeping.
FABRICATE AND INSTALL INSULATION FOR INSPECTION WINDOW DURING U21 & U11 WARRANTY INSPECTION FOR SOUTHERN POWER GENERATION (Aug'21 - Sept'21)
Client: SOUTHERN POWER GENERATION
Duration: 1 MONTH
SCOPE OF WORKS
To fabricate temporary and permanent inspection windows.
Remove insulation cladding and material to make a hole for the inspection window.
To install temporary and permanent inspection windows.
Housekeeping.
INSULATION WORK FOR GT 5TH AT CONNAUGHT BRIDGE POWER STATION (Jan'21)
Client: CBPS GF3
Duration: 10 DAYS
SCOPE OF WORKS
To remove, repair, and install new insulation material.
To fabricate and install new insulation cladding.
To standby during outage periods for emergencies & additional work.
To do the final inspection
Housekeeping
INSULATION WORK AT CONNAUGHT BRIDGE POWER STATION (Oct'20 - Nov'20)
Client: CBPS GF3
Duration: 1 MONTH
SCOPE OF WORKS
To remove, repair, and install new insulation material.
To fabricate and install new insulation cladding.
To do the final inspection
Housekeeping